Sunday, August 9, 2009

Flooring

The thick soundproofing pad goes in.
The plywood gets delivered. Two layers of 1/2" sheets will go down on top of the pad.
The plywood is down and the red oak has been delivered to acclimate properly to the moisure level in the house.
The floors have been istalled. It only took them two days! Crazy.
We're waiting another week before we sand and stain to let them further adjust to the moisture levels.